Briefing:

  • Industrial facility for rotational sintering (rotomoulding)
  • Integration of an existing rotational sintering plant with three-arm carousel, oven and cooling
  • Peripherals for loading and unloading the tools
  • Peripherals for filling the tools with sinter granulate
  • Peripherals for the removal of the demoulded blanks
  • Maximum cycle time of the whole facility = minimal cycle time of the carousel (sintering, cooling)

Scope:

  • Visualisation and design according to technical specifications and sketches
  • Elaboration and schematic representation
  • CAD/CAS — digital modelling
  • Animation to illustrate the processes (not real-time)
  • Additional illustrations for integration into the Animation
  • Film production (intro/outro, editing, inserting illustrations)